The Safety Director will take into consideration the application and generate a determination concerning if the rule variations is going to be built or not.Scheduled waterway policies Schedules for waterways in depth On this document are a reproduction of Formal notices posted inside the Victoria Govt Gazette and can't be useful for legal purpose